
Sangdong Baseball StadiumLotte Training Stadium
With two-year construction with investment of KRW 2.5 billion, this ultramodern Sangdong Baseball Stadium consists of three buildings, including Game Operation Center, Giants Center (team lodging), Giants Dome (indoor training facility) besides the main stadium.
The main stadium is equipped with 97m left/right and 120m center electronic display, dug out, and pitcher bullpen, ensuring title matches, such games of sub players. Premium materials are used on the infield/outfield ground, such as a mixture of 65mm long file artificial turf with environmentally-friendly green play rubber chips and red-soil en-tout-cas covers on the mound, home plate, and bases.
Giants Center, to be used as the team lodgings, covers the first story below and three stories above the ground building and accommodates up to 30 players (two in one), and is equipped with locker room, cafeteria, laundry room, shower booth, and lounge. Game Operation Center offers a grandstand that accommodates up to 100 people with additional facilities, such as coaches room, referee room, press room, broadcasting room, snack bar, and offices.
The indoor training facility is the biggest in Korea spanning 50m wide and 65m high, equipped with fitness center, bullpen, trainer room, and conference room, allowing batting and defensive training.